It is critical to ensure that all phone and gas lines have been marked.You must also over-excavate the perimeter of the area as you need to extend your base preparation past the finished size.The recommendation for over preparation is that the base material should extend past the paved edge an equal distance of the base depth.The guidelines are 4 to 6 inches for pedestrian walkways and 8 to 12 inches for driveways.
0 Comments
The first edition of the novel was published in November 11th 1975, and was written by Carlos Fuentes. ![]() |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |